The Ukraine gets ready for amalgamation with gas system of Poland

​The Ukraine and Poland have completed the preparation of the technical and economic assessment for the construction of the gas interconnector which will connect the gas systems of 2 countries.

The planned gas interconnector will comprise the construction of the route gas pipeline Germanovichi-Poland-Ukraine border, with the total length of 1.5 km on the territory of Poland and Bilche-Volytsya – Ukraine-Poland border with the length of 110 km on the territory of the Ukraine.

Moreover, in Poland a compressor station Strakhotsina, measuring station and parts of the gas pipeline will be constructed: Gemanovichi- Strakhotsina, Strakhotsina-Pogorska Volya, Pogorska Volya-Tvorzen and Tvorov-Tvorzen.

The project is to be completed until 2020.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer