Weatherford Company has held micro-seismic monitoring at Kogalym deposit of Lukoil-AIK

Weatherford Company has held the first series of micro-seismic monitoring at the Kogalym deposit of Lukoil-AIK CJSC. The monitoring was held while 4-stageous layer hydraulic fracturing at the horizontal well of the deposit. The micro-seismic control was performed while intensification with the help of a group of 8 digital 3-component seismoscopes installed at the neighboring bent hole. The speed model was built on the basis of the diagrams of cross-dipole acoustic carotage at the well before monitoring.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer