Pervouralsk new pipe plant extend its assortment

The new technology of semi-finished pipes for drill pipes with a weld-on tool joint PN 73x9 in accordance with the Federal standard 50278-92 has been engineered and successfully tested in the new section of the Pervouralsk pipe plant (a part of ChTPZ) in the finishing centre for the production and treatment of oil pipes. The test batch (30 tons) with excellent quality indicators of the dimensions and surface finish was shipped to the company KTIAM.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer