Gazprom: the construction of two drilling rigs for the Shtokman project are completed

 

The construction and testing of the rigs "Polar Star" and "Northern Lights", designed to work at the Shtokman gas condensate field, are completed. This is stated in the message of Gazprom.

In November 2007, in the result of an open tender of OOO Gazflot"(100 per cent subsidiary company of Gazprom ) and OAO  Vyborg Shipbuilding Plant signed a contract.

The platforms are designed for operation in harsh climatic conditions,  low temperatures, and wave heights up to 32 meters. They are also able to carry out exploration and development drilling of oil and gas wells up to 7.5 thousand meters at a depth of 70-500 meters.

 

Source: http://www.rosinvest.com/news/846659/

Translated by: Anstasia Edrenkina

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer