Vyksa metallurgical plant to increase production of pipes in electric-weld pipe workshop-2

The Vyksa metallurgical plant (VMZ, an enterprise of OMK) has carried out the upgrade of the second and third electric-weld pipe workshops. The objective of the program is the extension of the range of pipes produced and an increase of production capacity.

"In particular, as a result of the installation of three new high-performance pipe mills in the second workshop, its capacity will increase by almost a third to 0.29 million tons of pipes per year," – the VMZ’s press release reports.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
42a Pushkina Street; Ufa, Bashkortostan 450076; Russia
E 54° 43.48836" N 55° 55.52346"
Telephone: +7 927 303 00 25

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer