Belorusneft completes installation of drilling rig at the Rosneft’s Tarasovskoye field
Edited by Rhod Mackenzie / 2016-09-13 04:57:56
The secondary installation of a drilling rig at the well №259 has been completed at the Tarasovskoye field. This was reported by. Belorusneft on September 13, 2016.