PROMKO delivers more than 500 tons of metal at the "Southern Corridor".
The PROMKO company has delivered more than 500 tons of metal for the "Southern Corridor" gas transportation system site. In late February, the PROMKO company's specialists worked on manufacturing the critical structures for 19 items of the "Ekaterinovka" compressor station: a gas preparation system installation,the installation of the harvesting of gas purification products container, the diesel power plant, pumping station of fire extinguishing, the water intake and sewage treatment facilities, the repair and maintenance unit, the backup engine storage site, the monitoring and checkout block with the check passage, internal networks, etc. The metalwork passed primer and painting, as well as non-destructive quality control on the production site of PROMKO