TAPI gas pipeline construction to start in 2015

G.Berdymukhamedov, the president of Turkmenistan has ordered the start of the construction of the gas transmission main pipeline TAPI without delay. The president wants the gaspipe line laying to start in 2015.

On April 10th, Berdymukhamedov asserted during the meeting, dedicated to the development of oil-and-gas sector that there must be prepared and issued all the documents needed before the end of 2014. The laying of the pipelines, according to president, is to start in 2015.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer