Rosneft has started the construction of the oil pipeline from the Suzun deposit at the Vankor cluster

 Vankorneft CJSC – affiliate of Rosneft – in conformity with the program of development of the Suzun deposit has started the construction of the forcing oil pipeline which will connect the Suzun and Vankor deposits, Rosneft reports.

The total length of the oil pipeline will be 101 km.

The launch of the oil pipeline will be synchronized with the other objects of the first stage of the Suzun deposit: project fund of the extraction and injection wells, oil preparation unit with the capacity of 5.2 mln tons a year, intrafield pipelines of the first stage with the length of about 30 km, roads and other objects of infrastructure.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer