Rosneft has started the construction of the oil pipeline from the Suzun deposit at the Vankor cluster
Edited by Rhod Mackenzie / 2014-12-09 12:35:43
Vankorneft CJSC – affiliate of Rosneft – in conformity with the program of development of the Suzun deposit has started the construction of the forcing oil pipeline which will connect the Suzun and Vankor deposits, Rosneft reports.
The total length of the oil pipeline will be 101 km.
The launch of the oil pipeline will be synchronized with the other objects of the first stage of the Suzun deposit: project fund of the extraction and injection wells, oil preparation unit with the capacity of 5.2 mln tons a year, intrafield pipelines of the first stage with the length of about 30 km, roads and other objects of infrastructure.