New drilling rig to be constructed for the Absheron field

A drilling rig will be necessary in 2017 already for extraction of the first gas condensate from the Absheron field in the Azerbaijani sector of the Caspian Sea, a source on oil and gas market told the Trend.
 
According to him, provision of gas production within the time specified will require the necessary drilling operations and creation of all necessary extracting infrastructure. The main issue in the Absheron field development is the presence of free floating drilling rig.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer