The third steam turbine shipped to Astana for heat and power station-2
Edited by Rhod Mackenzie / 2016-02-09 03:02:58
The steam turbine T-120/130-130-8MO was made by Ural Turbine Works. Two similar turbines are operated at the station since 2006 and 2015. The shipped turbine will begin work at the end of this year.