BP makes public the data on the volume of production within the bounds of oil and gas projects in Azerbaijan
Edited by Rhod Mackenzie / 2013-08-08 09:31:33
By now, Shakh Deniz gas condensate deposit has produced 43 billion cubic m of gas and 11 million tons of gas condensate. The deposit reserves are 1.2 trillion cubic m.
The contract for the deposit development was signed on June 4 1996. The participants in the project BP (the operator) with 25.5%, Statoil with 25.5%, NICO with 10%, Total with 10%, Lukoil with 10%, TPAO with 9%, SOCAR with 10 %.