Azeri oil pumping by BTC in Jan-May fell by 2%

​The volume of Azeri oil pumping by Baku-Tbilisi-Ceyhan in Jan-May 2015 made up 11 mln 946.559 thousand tons, by 2.1% less than in Jan-May 2014. Besides this, in May 482.622 thousand tons of Turkmen and Kazakh oil were pumped by the pipeline.

From the moment of putting the pipeline into operation (June 4th 2006) until June 1st 2015, the volume of pumping made up 275 mln 771.491 thousand tons, including 2 mln 386.815 thousand tons in May 2015.

In Jan-May 2015, 11 mln 713.26 thousand tons of Azeri oil were shipped from the Ceyhan oil terminal, including 2 mln 473.865 thousand tons in May 2015. From the moment of putting BTC into operation273 mln 652.35 thousand tons of Azeri oil were shipped from the Ceyhan terminal.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer