Horizontal well has been successfully drilled at Achimovsky deposits of Urengoy
Edited by Rhod Mackenzie / 2013-11-07 01:53:13
ERIELL Group with the complex technological support of Schlumberger has successfully drilled within a short period of time a horizontal well with depth of 5,200 m under the contract with Arcticgaz JSC at the Achimovsky deposits of the Urengoy gas condensate deposit. The horizontal hole with length of 1,000 m simultaneously outstrips 3 production objects.