SOCAR has put into operation well #216 after capital repair at Gyuneshli

​After capital repair of the well SOCAR put it into operation at the shallow part of the Gyuneshli deposit.

Previously the well #216 was drilled from the offshore basis #5

The well output after repair works makes up 47 tons of oil a day and 11.5 thousand cubic m of gas a day.

The Oil and Gas Extraction Management “May 28” carries out the works on the operation of the well.

On May 23rd 2016 SOCAR put into operation the well #256 which was drilled from the offshore basis #14.

The well output after the repair works makes up 55 tons of oil and 120 thousand cubic m of gas a day.

On May 18th SOCAR put into operation the well #303 which was drilled from the offshore basis #8.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer