CNPC: Power of Siberia to be built on schedule

CNPC is confident that the construction of the Power of Siberia gas pipeline will be held according to the schedule.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
42a Pushkina Street; Ufa, Bashkortostan 450076; Russia
E 54° 43.48836" N 55° 55.52346"
Telephone: +7 927 303 00 25

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer