Ministry of Industry and Trade expects Rosneft, Gazprom and Novatek to prepare orders for “Zvezda” by 2018

The Ministry of Industry and Trade expects Rosneft, Gazprom and Novatek to prepare orders for the construction in the Far East “Zvezda” shipyard by 2018, Minister of Industry and Trade, D. Manturov, said.

“Speaking about the current situation at Zvezda, in 2016 metal cutting will start at the block of corpus production, and after the reception of the descender unit in 2018 the first order should be produced there. So by 2018 a package of order will be ready which is being formed now by Gazprom, Novatek and primarily by Rosneft that holds the main package of shares of Zvezda”, he said.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer