First pipes for Power of Siberia delivered to Lensk

The first lot of pipes (260 pipes with the total weight of about 2.4 thousand tons) meant for the construction of the gas pipeline system “Power of Siberia” have been delivered and accepted by “VTK-Lena” Ltd and “Rechservice” Ltd (in the structure of Starway GC together with the Osetrovsky river port), the press service of the Osetrovsky river port OJSC reported. On July 30th the floating cranes of the Osetrovsky river port and VTK-Lena unloaded pipes in Lensk that will be used at the site from the Chayanda deposit to Lensk. Rechservice and VTK-Lena will accept 40 thousand tons of pipes for navigation – the entire volume planned to be delivered by river this year.

In July Starway GC shipped the equipment of contractors that had been waiting for shipment to Gazprom’s objects.

Specially for cargo processing of Gazprom and contractors of construction of Power of Siberia, the Osetrovsky river port, VTK-Lena and Rechservice prepared sites for storage and load grippers.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer