TANAP to reach full capacity in 2026
Edited by Rhod Mackenzie / 2014-06-05 10:57:43
TANAP which aims for Azeri gas transportation via the territory of Turkey to the border with Europe will be put into operation in mid 2018. The first Vice-President of SOCAR for geology, geophysics and development of deposits, Kh. Yusifadze said.
According to him, the full projected capacity of 31 bln cubic m a year the gas pipeline will be reached in 2026.
Speaking about the gas production at the Shakh-Deniz, the first Vice-President of SOCAR said as of June 1st 2014 about 52 bln cubic m of gas and 13.5 mln tons of condensate have been produced.