Gazpromneft connects the Badra field to the main pipeline system of Iraq

Gazpromneft has completed the construction, testing and the connection of the oil pipeline with length of 165 km from the Iraqi field Badra, which operator the company is, to the Garraf field (next to Nasiriya). Taking into account the infrastructure at the Garraf field, the construction of the pipeline from Badra allows the company to connect this field with the general main oil transport system of Iraq.

The infrastructure created on the transportation of the raw material from the Badra field has throughput capacity in the volume of 204 thousand barrels per day (about 10 million tons per year) and enables to supply oil to the export terminal in Basra.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer