Gazpromneft may increase oil rate-level at the Novoport field in the Yamal-Nenets Autonomous District before the end of the year

Gazpromneft may increase the annual oil rate-level at the Novoport field from the current 5.5 million tons before the end of the year, the company’s first deputy general director, Vadim Yakovlev reported to journalists.

“Currently a draft investment solution has the oil rate-level at the level of 5.5 million tons, we will consider an increase of the level before the end of the year,” – he said, but didn’t specify the possible volumes.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer