Gazprom elaborates the project of Amur gas refinery
Gazprom has announced the tender for elaboration of the technical specifications within he preparing of the design documentation for a gas refinery in the Amur region. The initial cost of the work is 16.611 million rubles. The total area of the complex including the torch enterprise and the commodity and raw material base will be 800 ha.
The operator of the project will be Gazprom’s subsidiary VNIPIgazdobycha. The contractor will be announced on August 8th. Applications acceptance will be stopped within 3 days until announcement of the results.
The technical design specification for the tender stateds that the contractor should concern the demands of the placement of the designed gas refinery nearby to an airdrome of the Ministry of Defense and the Eastern space airfield and nearby to the settlements. The elaborated technical specifications should be coordinated with the Russian Ministry of Construction and Housing and the Utility Sector, with the headquarters of long-range aviation of the Ministry of Defense, the Federal Space Agency Roscosmos, and the Ministry of Civil Defense.