Preparation for infrastructure construction starts at the Messoyakh group of fields
The mobilization of service drilling companies, as well as delivery of equipment and materials for the construction of the main infrastructure facilities, which are necessary for the field development, have been started at the Messoyakh group of fields. As the delivery of cargo to the building site is possible only in winter, their transportation is carried out after the construction of winter roads, Gazpromneft’s press centre reported.
In 2014, works on preparation for construction of a central gathering station, gas-turbine station, oil pipeline with length of about 100 km and point of commercial measurement and oil delivery to the main pipeline system Zapolyarie-Purpe will be carried out at Messoyakh. These facilities are scheduled to be launched at the end of 2016.
.