The preparation of the gas pipeline to the Crimea and construction of stations in the republic is on scedule
Edited by Rhod Mackenzie / 2015-08-03 07:45:57
Gas power stations construction in the Crimea is up to the schedule. They will accept the fuel from the Kuban-Crimea gas pipeline, which is at the stage of preparation to construction too. Minister of Energy of Russia A.Novak stated about it during his visit to the republic, RIA Novosti reports.