SOCAR will build oil collecting points at Oil Stones

Before the end of 2014, SOCAR is going to complete construction of a part of the plants of the consolidated oil collection point at the Oil Stones deposit. The construction is carried out by the Neftqaztikinti trust. The project is aimed at the creation of a centralized system for the collection and utilization of the layer water for the prevention of contamination with oil and oil products of the Caspian Sea and environmental protection.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer