New power facilities are being built in the Amur Region for the needs of the Power of Siberia gas pipeline

The branch of JSC "DRSK" - "Amur Electric Networks" - is building two substations and four power lines with a voltage of 110 kV.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
42a Pushkina Street; Ufa, Bashkortostan 450076; Russia
E 54° 43.48836" N 55° 55.52346"
Telephone: +7 927 303 00 25

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer