Reconstruction of the substation for the Yakut center of gas production of the Power of Siberia begins.

A new power transformer was installed at the 220 kV Olekminsk substation (substation) in the course of technical connection of the Power of Siberia mai

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer