Uralmashzavod to deliver drilling equipment to Arctic
Edited by vadim / 2013-08-02 06:48:01
Arctica 6000/400 EK-BMCh drilling rig was designed by Uralmash NGO Holding for Integra-Bureniye LLC. The rig will be used for development of South Tambey deposit in Yamal. More than 800 tons of equipment will be produced, including guide arches, modules of right and left side bars, a derrick and a catwalk machine module. The time of delivery is November 2013.