The third branch of the Central Asia-China gas pipeline starts working in Uzbekistan
Edited by Rhod Mackenzie / 2014-06-02 12:42:18
Kazakhstan Oil and Gas Turkmenistan Uzbekistan Kazakhstan Oil and Gas Turkmenistan Oil and Gas Uzbekistan Oil and Gas Gas Pipelines
The third branch of the Central Asia-China gas pipeline has been launched. Gas from Turkmenistan to Uzbekistan was supplied via this string on May 31st of 2014.
Let’s recall, the C branch is laid parallel to the A and B branches, its total length reaches 1830 km. The designated capacity of the gas pipeline is 25 billion cubic meters of gas per year, 10 billion of which will be supplied from Turkmenistan, 10 billion from Uzbekistan, 5 billion from Kazakhstan.