In March of 2014, Gazpromneft to start production in the amount of 60 thousand barrels per day at Badra

Production at the Iraqi field of Badra, at which the operator is Gazpromneft, will start in March of 2014; the production volume will make up 60 thousand barrels per day.

Let’s recall, on October 4 of 2013, the Gazpromneft’s Head, A.Dyukov reported that Gazpromneft would be to start the production at Badra in 2013, but this term might be postponed to the beginning of 2014 because of problems with contractors.

The test oil production in the amount of 15 thousand barrels per day at the Badra field in Iraq may start on November 15th of 2013.

Full text available to premium subscribers only.

Buy full access for 24 hours now

or

Request a quote to subscribe for a longer period

Oil and Gas, Metals and Mining, News from Russia and neighbouring countries
12 Northfields Prospect; London, - SW18 1PE; United Kingdom
E 51° 27.454518" S 0° 14.101236"

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer